Walk-in Showers in Newmarket
Short answer
A custom walk-in shower replaces a cramped stall or bathtub with a fully waterproofed tiled enclosure, frameless glass, recessed niches and a built-in bench or fold-down seat. In Newmarket, our 9 x 12 ft four-piece ensuite labour package with a curbless walk-in shower starts at $11,500.

Where walk-in showers make the biggest difference in Newmarket homes
Across Newmarket, homeowners ask us to build custom tiled walk-in showers for two main reasons. In Stonehaven-Wyndham, Woodland Hill, Summerhill Estates and Copper Hills, the upstairs primary ensuite almost always has a large corner soaker tub on a tiled deck beside a tight 32- or 36-inch acrylic shower stall. Removing both the unused corner deck and the cramped stall opens up a full wall for a spacious glass walk-in shower with a bench, recessed niches and dual shower heads.
In Gorham-College Manor, Huron Heights, Bristol-London and Glenway, the goal is often replacing a 60-inch alcove bathtub with a bright, easy-entry shower—just like our Newmarket dual walk-in shower renovation, where we converted two upstairs tub alcoves in the same Newmarket house into custom porcelain walk-in showers with matte-black fixtures, linear drains and an LED-lit vertical niche.
If you are planning ahead for safe mobility or adapting a room for an older parent, adding a curbless or low-profile entry, a fold-down or tiled seat, a slide-bar hand shower and solid wood blocking behind the tile for grab bars is straightforward while the walls are open. See our accessible bathrooms in Newmarket page and our Newmarket accessible walk-in shower case study.
Designing your walk-in shower
Curbless (zero-threshold) vs. low-curb entry
A curbless shower runs the main bathroom floor tile directly into the shower pan with no step to cross. It looks seamless, is effortless to clean, and eliminates any tripping edge. Because the shower floor still has to pitch toward the drain, our crew either recesses the subfloor between the joists or raises the outer bathroom floor slightly. On a second floor in a wood-framed Newmarket house, we check joist depth, span and direction before confirming a recessed curbless pan.
A low-curb shower places a slim 3-to-4-inch stone or tiled threshold along the glass line. It works over any upstairs joist layout without structural modifications, keeps water contained reliably, and costs less in carpentry than a recessed pan.
Linear trench drains vs. centre point drains
A linear drain sits along one wall or across the shower threshold so the entire floor slopes in a single flat plane. That allows us to lay large-format porcelain tiles right across the shower floor—as shown in our Newmarket dual shower project and our Yonge Street condo shower case study. A centre point drain slopes from all four sides toward the middle, which pairs well with 2-inch hex or square mosaic tile for extra grip underfoot and costs less to install.
10 mm frameless glass, lit niches and benches
Depending on your bathroom layout, we install a fixed walk-in glass panel (splash screen), a hinged frameless door and panel, or sliding frameless doors with matte-black, brushed-brass or chrome hardware. Every custom glass enclosure is laser-measured after the wall tile is grouted so it fits out-of-square walls cleanly without bulky metal framing.
Inside the wet zone, we frame recessed shampoo niches aligned with your tile courses—with optional warm LED strip lighting—and build solid waterproofed corner or full-width benches (or floating stone benches like the one in our Bradford primary ensuite case study).
Walk-in shower costs in Newmarket
When a custom walk-in shower is built as part of an ensuite or wet-room renovation, our published labour packages show the exact installation scope before finish materials:
| Bathroom | What's included | Labour from |
|---|---|---|
| 4-piece primary ensuite with curbless shower9 x 12 ft |
| $11,500 |
| Wet room with shower and jetted tub15 x 8 ft |
| $15,000 |
Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 6, 2026.
Finish materials—porcelain or stone tile, the linear or point drain, mixing valve and trim, and custom glass—are priced separately so you can pick the exact fixtures you want. If you are converting an existing tub alcove or rebuilding only the shower stall while keeping your vanity and toilet, we quote the job line by line; a recent curbless accessible shower conversion of ours came to about $15,000 all-in. Check our Newmarket bathroom renovation cost guide for per-square-foot tile rates and trade line items.
Seven steps behind a leak-free tiled shower
- Strip-out to bare studs. We protect your floors and remove the old acrylic stall, tub deck, tile and drywall down to the framing.
- Framing and joist check. We inspect the subfloor for moisture damage, reinforce framing, and recess the floor if building a curbless pan.
- Rough-in plumbing. We install a new pressure-balanced or thermostatic mixing valve, diverter and 2-inch shower drain trap.
- Niches, bench and blocking. We frame recessed niches and benches, add 2x8 wood blocking for glass hinges and grab bars, and hang waterproof backer board.
- Continuous bonded waterproofing. Every shower wall, floor pan, curb, niche and bench is covered with a continuous waterproof membrane, with sealed corner bands and drain flange connection.
- Tile setting and grouting. Wall slabs and floor tile are set with levelling clips to your approved drawings, grouted, and sealed with flexible silicone at all corners.
- Plumbing trim and custom glass. Shower heads and controls are mounted, and custom tempered glass is measured and fitted. Read more on our renovation process page.
Town of Newmarket permits and second-floor framing
Relocating a shower drain requires a permit. Rebuilding a shower in the exact same footprint using the existing drain trap does not require a municipal building permit. Moving the drain across the floor—for instance, when combining a corner tub and stall into one larger shower—or upgrading a 1.5-inch tub trap to a 2-inch shower drain is a plumbing alteration that requires a Town of Newmarket building permit. Source: Town of Newmarket: Residential Building Permits and Plumbing Alterations (accessed October 10, 2026) See our article on Newmarket bathroom renovation permits.
Engineered joists vs. concrete slabs. Many 2000s homes in Woodland Hill and Copper Hills use engineered wood I-joists upstairs, which cannot be notched without an engineered detail. We inspect your floor framing early and advise whether a recessed curbless pan or a low-profile curb is the right structural choice. In a basement bathroom, trenching the concrete slab makes a curbless entry straightforward.
Planning to remove a bathtub for your new shower? Visit our tub-to-shower conversion in Newmarket page, or upload photos of your bathroom for a free itemized quote.
Before and after
Real projects of this type. Drag the slider to compare.








Related projects

Newmarket project
Two Newmarket tub alcoves converted to walk-in showers
Two upstairs bathrooms in the same Newmarket house, each converted from an alcove tub to a walk-in shower with Carrara-look wall porcelain, charcoal floor tile, matte-black fixtures and a linear drain.

Newmarket project
Accessible walk-in shower conversion in Newmarket
A one-piece acrylic tub and surround in a Newmarket home replaced with a low-threshold tiled walk-in shower, fold-down wall seat, grab bar and handheld shower on a slide bar.

Bradford project
Primary ensuite in Bradford with freestanding tub and curbless shower
Full primary bathroom finished in large-format marble-look porcelain, with a freestanding oval tub under the window, a curbless frameless glass shower with a floating bench, and a white shaker vanity.
Walk-in Showers: common questions
What is the practical difference between a curbless shower and a low-curb shower?
A curbless shower keeps the bathroom floor completely level into the wet zone, making it effortless to step or wheel into, though it requires recessing the subfloor joists so the pan still slopes to the drain. A low 3-to-4-inch tiled curb sits on top of the existing subfloor, which simplifies framing and reduces labour cost.
When is a linear trench drain worth choosing over a standard centre drain?
A linear drain lets the entire shower floor pitch in a single plane toward one wall, which means we can lay large-format floor porcelain right into a curbless shower without cutting the tiles into a four-way envelope. A centre drain works well with 2-inch hex or square mosaic sheets and costs less.
Why does custom frameless shower glass take extra time at the end of the project?
Ten-millimetre tempered glass panels cannot be trimmed once fabricated, so the glazier measures the opening only after our wall tile and stone sill are grouted. Fabrication and tempering take several business days, after which we return to mount the hinges, clamps and seals.
What waterproofing system goes behind your shower tile?
Because ceramic tile and grout absorb moisture, we build every shower enclosure with waterproof foam backer board, sheet membrane and seam bands sealed to an integrated bonding flange at the drain and mixing valve, creating a watertight shell before any mortar or tile goes on.
Other bathroom services

Full Bathroom Renovation
Stripped to the studs and rebuilt with new plumbing, waterproofing, tile and fixtures.

Tub-to-Shower Conversion
Replace an unused bathtub with a spacious, easy-entry tiled walk-in shower.

Bathtub Replacement
Deep alcove soaker tubs, corner whirlpool removals and freestanding tubs with waterproofed tile surrounds.

Small & Condo Bathrooms
Compact 5 x 8 ft bathrooms and condo suites along Davis Drive, Yonge Street and Glenway.

Basement Bathrooms
Three-piece basement bathrooms built on existing rough-ins or with new drains trenched through the slab.

Accessible Bathrooms
Step-free curbless showers, fold-down seats, grab bars and comfort-height fixtures for safe daily living.

Bathroom Repairs
Ceiling water stains, leaking shower pans, attic fan ducts, mould and fixing unfinished contractor work.